Interior parts for public transport
An industrial client
- Industry
- Transport
- Technology
- FDM
- Material
- ASA
- Quantity
- 25 parts
- Lead time
- 5 days
The challenge
The client needed interior parts in a short time and at stable quality.
Our approach
FDM was chosen for the interior parts, and the file was optimised for printing.
The result
25 interior parts were delivered in 5 days and passed the dimensional check.
-36%
Cost versus previous method
5 days
Lead time