Interior parts for public transport

An industrial client

Interior parts for public transport
Industry
Transport
Technology
FDM
Material
ASA
Quantity
25 parts
Lead time
5 days

The challenge

The client needed interior parts in a short time and at stable quality.

Our approach

FDM was chosen for the interior parts, and the file was optimised for printing.

The result

25 interior parts were delivered in 5 days and passed the dimensional check.

  • -36%

    Cost versus previous method

  • 5 days

    Lead time

Gallery

Have a similar challenge?

Request a quote