What you get
With nylon and other engineering materials we make parts that carry mechanical load, locate or protect other components.
- Engineering materials
- Mechanical testing advice
- Surface finishing options
Technologies
- SLS
Specifications
- Tolerance
- ±0.3 mm
- Lead time
- 4–8 days
- Max build size
- 340 × 340 × 600 mm
Frequently asked questions
Do the parts take load?
It depends on the material; we can send the datasheet.