Cable guides for a power network
An industrial client
- Industry
- Energy
- Technology
- SLS
- Material
- Nylon PA12
- Quantity
- 40 parts
- Lead time
- 6 days
The challenge
The client needed cable guides in a short time and at stable quality.
Our approach
SLS was chosen for the cable guides, and the file was optimised for printing.
The result
40 cable guides were delivered in 6 days and passed the dimensional check.
-32%
Cost versus previous method
6 days
Lead time