Assembly fixtures for a conveyor line
An industrial client
- Industry
- Manufacturing
- Technology
- FDM
- Material
- PETG
- Quantity
- 12 parts
- Lead time
- 3 days
The challenge
The client needed assembly fixtures in a short time and at stable quality.
Our approach
FDM was chosen for the assembly fixtures, and the file was optimised for printing.
The result
12 assembly fixtures were delivered in 3 days and passed the dimensional check.
-45%
Cost versus previous method
3 days
Lead time